Mashing system:
Mashing tank:
Material: SS 304 HEATING : BY STEAM
With agitator FROM ABOVE; Motor ABB and Mash Hydrator
Special: 1)with sight glass and light. 2) Lockable manhole Glass cover. Hinge of Manhole Door to be reinforced. Electric wire inside of the tank. 3)Two Spray ball inside. 4)SS Level gauge to be calibrated. 5)Hot Water connection T-joint and CIP to spray ball (2 butterfly valve). 6)One T joint connection with hot water tank and with hose pipe. 7)2.5m extra SS chimney. 8) Inner total Volume 670L 9) T-joint below tank in Brew House Piping10) Butterfly Valve connection in SS pipeline of CIP so that when CIP is done in one tank, it does not flow into other tank ( This problem is there in 3rd and 8th customer) 11)Provide a Funnel attachment to Remove Spent Malt into bucket ; 17)add an inlet on top of the tank,with butterfly valve.18) Inside outer SS304 chimney one SS chimney to remove steam, steam discharge outside room.
Mash Hydrator fixed
Material: SS 304
THE FILTER PLATE SUPPORT TO BE STRENGTHENED TO SUPPORT 250 KG MALT
Agitator: With ABB Motor and variable Speed controller by PLC.
AGITATOR WITH KNIFE AND CHAIN
Special: 1)with sight glass and light. 2) Lockable manhole Glass cover. Hinge of Manhole Door to be reinforced. Electric wire inside of the tank. 3)Two Spray ball inside. 4)SS Level gauge to be calibrated. 5)Hot Water connection T-joint and CIP to spray ball (2 butterfly valve). 6)One T joint connection with hot water tank and with hose pipe. 7)Inside outer Copper chimney one SS chimney to remove steam. 8) Inner total Volume 670L 9) T-joint below tank in BrewHouse Piping10) ButterflyValve connection in SS pipeline of CIP so that when CIP is done in one tank, it does not flow into other tank ( This problem is there in 3rd and 8th customer) 11)Provide a Funnel attachment to Remove Spent Malt into bucket ; 17)add an inlet on top of the tank,with butterfly valve.
MATERIAL SS304
Special: 1)with sight glass and light. 2) Lockable manhole Glass cover. Hinge of Manhole Door to be reinforced. Electric wire inside of the tank. 3)Two Spray ball inside. 4)SS Level gauge to be calibrated. 5)Hot Water connection T-joint and CIP to spray ball (2 butterfly valve). 6)One T joint connection with hot water tank and with hose pipe. 7)Inside one SS chimney to remove steam. 8) Inner total Volume 670L 9) T-joint below tank in BrewHouse Piping10) ButterflyValve connection in SS pipeline of CIP so that when CIP is done in one tank, it does not flow into other tank ( This problem is there in 3rd and 8th customer) 11)Provide a Funnel attachment to Remove Spent Malt into bucket ; 17)add an inlet on top of the tank,with butterfly valve.
HEATING: BY STEAM AND BY ELECTRICITY ---- DUAL SYSTEM IF BOILER IS NOT WORKING
With Spray Ball Inside for CIP
Special: with sight glass on manhole cover and sight light. Electric wire inside of the tank. Lockable Manhole. SS Level gauge to be calibrated. SS piping and pump to Brew house and PHE. Temperature control to show in PLC. wires inside electric connection box of heaters must be insulated to protect them from heat (this problem in all plants).